Smart Skills

Boulevard Riyadh Shear Stud Project

Smart Skill executed specialized shear stud installation and welding works across designated structural zones within the Boulevard Riyadh shear stud project. The fast-track nature of the development required organized planning and continuous coordination with the structural steel, metal decking, reinforcement, quality, and concrete teams.

The executed scope included the installation, welding, inspection, testing, and handover of approximately 14,000 to 19,000 shear studs across an estimated composite structural area of 6,000 to 8,500 square meters. The shear connectors were installed directly onto structural steel beams or through profiled metal decking according to the approved structural details.

The works were completed progressively based on the readiness of each structural zone, supporting reliable composite action between the steel beams and reinforced concrete floor slabs while maintaining the required quality and construction sequence.

Specialized Shear Stud Contractor in Riyadh

As an experienced shear stud contractor in Riyadh, Smart Skill delivered professional shear connector installation and structural steel stud welding services within selected areas of the Boulevard Riyadh construction project. The scope included surface preparation, stud positioning, welding, quality inspection, field bend testing, rectification, and final handover.

Through its experience in shear stud welding in Saudi Arabia, Smart Skill supports entertainment and commercial developments with reliable composite floor shear studs and quality-controlled execution. The company operates as a professional stud welding contractor in Riyadh and shear stud supplier in Saudi Arabia, providing complete shear connector welding services and shear stud inspection for major structural steel projects.

Project Information

  1. 1

    Location

    Riyadh, Saudi Arabia
  2. 2

    Project Type

    Entertainment & Commercial Development
  3. 3

    Executed Area

    Approximately 6,000–8,500 m²
  4. 4

    Execution Duration

    Approximately 2–3 Weeks Across Multiple Work Zones
  5. 5

    Shear Stud Quantity

    Approximately 14,000–19,000 Studs
  6. 6

    Steel Beam Coverage

    Approximately 2.5–3.8 Linear Kilometers