Smart Skill executed specialized Masar Makkah shear stud installation works across designated composite structural zones within the Masar Project in Makkah, a major mixed-use development combining hospitality, retail, mobility, cultural, and commercial facilities.
The executed scope included the installation, welding, inspection, testing, and handover of approximately 18,000 to 24,000 shear studs across an estimated structural area of 8,000 to 11,000 square meters. The shear connectors were installed directly onto structural steel beams and through profiled metal decking according to the approved structural details.
The works were completed progressively by specialized stud welding teams in coordination with structural steel, metal decking, reinforcement, quality, and concrete activities, supporting reliable composite action between steel beams and reinforced concrete floor slabs.