Smart Skills

Masar Makkah Shear Stud Installation

Smart Skill executed specialized Masar Makkah shear stud installation works across designated composite structural zones within the Masar Project in Makkah, a major mixed-use development combining hospitality, retail, mobility, cultural, and commercial facilities.

The executed scope included the installation, welding, inspection, testing, and handover of approximately 18,000 to 24,000 shear studs across an estimated structural area of 8,000 to 11,000 square meters. The shear connectors were installed directly onto structural steel beams and through profiled metal decking according to the approved structural details.

The works were completed progressively by specialized stud welding teams in coordination with structural steel, metal decking, reinforcement, quality, and concrete activities, supporting reliable composite action between steel beams and reinforced concrete floor slabs.

Specialized Shear Stud Contractor in Makkah

As an experienced shear stud contractor in Makkah, Smart Skill delivered professional shear connector installation and structural steel stud welding services within selected areas of the Masar Makkah project. The scope included surface preparation, stud positioning, welding through metal decking, quality inspection, field bend testing, rectification, and final handover.

Through its capabilities in shear stud welding in Saudi Arabia, Smart Skill supports major mixed-use and hospitality developments with reliable composite floor shear studs and quality-controlled site execution. The company operates as a trusted stud welding contractor in Makkah and shear stud supplier in Saudi Arabia, providing complete shear connector welding services and professional shear stud inspection for major structural steel projects.

Project Information

  1. 1

    Location

    Makkah, Saudi Arabia
  2. 2

    Project Type

    Mixed-Use, Hospitality & Commercial Development
  3. 3

    Executed Area

    Approximately 8,000–11,000 m²
  4. 4

    Execution Duration

    Approximately 3–4 Weeks Across Multiple Work Zones
  5. 5

    Shear Stud Quantity

    Approximately 18,000–24,000 Studs
  6. 6

    Steel Beam Coverage

    Approximately 3.5–5 Linear Kilometers